Fig. 21
3. Unplug all connecters from power supply box and
remove box from under fryer.
4. Remove cover to access power supply box
components.
Fig. 22
Fig. 23
5. Reverse procedure to install.
POWER SUPPLY BOX
COMPONENTS BEFORE 12/1/12
NOTE: The ignition module, blower control board and
the time delay timers will not be available to the field
any longer. If any one of these items fail, replace
power supply box. However, the filter relays and the
transformer are still available and can be replaced in
the field.
Ignition Module
Replace with updated Power Supply Box Assembly.
Blower Control Board
Replace with updated Power Supply Box Assembly.
Time Delay Timers
Replace with updated Power Supply Box Assembly.
Blower Relay
Replace with updated Power Supply Box Assembly.
Filter Relays (24 VAC and 120 VAC)
1. Remove POWER SUPPLY BOX.
2. Note location of all wiring to the relay and remove
wiring.
3. Remove screw and remove relay from box.
VK and TR GAS FRYERS W/Wo KleenScreen PLUS - REMOVAL AND REPLACEMENT OF PARTS
F45474 (0413) Page 14 of 54