– 6 –
MGB-A OPERATING, INSTALLATION, SERVICE & PARTS
1. Lighting instructions are inside the front panel. To
open the panel to reach the manifold.
a. Remove thumb screws from upper front panel,
lift upper front panel until it clears the lower front
panel.
b. To install the upper front panel, place panel above
lower front panel, slip upper panel down so it
engages lower front panel.
2. LIGHTING PILOT: If the pilot goes out, an automatic
shut-off valve turns off the gas supply to the burners.
To relight the pilot follow procedure.
a. Turn the control valve to “off”. Wait a sufficient
length of time to allow gas which may have accumu-
lated in the burner compartment to escape (at least
five minutes).
b. Turn on the main shut-off valve.
c. Depress and hold in on the red button “A” on the
automatic shut-off valve while lighting the pilot
burner.
d. When gas at pilot has been running for about 45
seconds, release the red button. If pilot does not
remain lighted, repeat the operation allowing more
time before releasing red reset button.
3. MAIN BURNER AIR SUPPLY
For efficient burner operation, it is important that a proper
balance of gas volume and primary air supply is main-
tained, resulting complete combustion. Insufficient air
supply results in a yellow streaming flame. Check flames
with control knob turned to “HI”, and radiants and top
grates removed. Primary air supply is controlled by air
shutter on front of the burner.
Loosen the hexagonal head screws on front of the
burner, and adjust the air shutter to obtain a sharp flame
without lifting. Lock the air shutter in place tightening the
screws. Repeat this procedure with all burners.
Do not permit fans to blow directly at the unit and
wherever possible avoid open windows next to the unit
sides and back. Avoid wall type fans which create air
cross currents within the room.
It is also necessary the sufficient air should be allowed to
enter the room to compensate for the amount of air
removed by any ventilating system. Otherwise, a subnor-
mal atmosphere pressure will occur, affecting operation
adversely and causing undesirable conditions.
A properly designed and installed hood will act as the
heart of the ventilating system for the room or area in
which the unit is installed, and will leave the unit indepen-
dent of changing draft conditions.
C. LIGHTING AND ADJUSTMENT
FIGURE 1
e. To adjust the pilot flame, remove pilot adjustment
cap “B” (Figure 1) to expose the adjusting screw.
Rotate the adjusting screw clockwise to reduce the
gas flow; and counterclockwise to increase the
gas flow, to provide a properly sized pilot flame
(approximately
1
2" to
3
4" long) Replace the adjust-
ment cap “B”.