Vulcan-Hart VSP100 Especificaciones

Busca en linea o descarga Especificaciones para Cocinas Vulcan-Hart VSP100. Vulcan-Hart VSP100 Specifications Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 12
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 0
VULCAN-HART COMPANY, P.O. BOX 696, LOUISVILLE, KY 40201-0696, TEL. (502) 778-2791
INSTALLATION, OPERATION, SERVICE &
PARTS MANUAL
FOR STOCK POT RANGE
MODELS VSP100, VSP200 & VSP300
FORM 30780 (3-92)
MODEL VSP100
Vista de pagina 0
1 2 3 4 5 6 ... 11 12

Indice de contenidos

Pagina 1 - FOR STOCK POT RANGE

VULCAN-HART COMPANY, P.O. BOX 696, LOUISVILLE, KY 40201-0696, TEL. (502) 778-2791INSTALLATION, OPERATION, SERVICE &PARTS MANUALFOR STOCK POT RANGE

Pagina 2 - FOR YOUR SAFETY

– 10 –STOCK POT INSTALLATION, OPERATION, SERVICE & PARTSVSP100 STOCK POT RANGE

Pagina 3 - STOCK POT RANGES

– 11 –STOCK POT INSTALLATION, OPERATION, SERVICE & PARTSITEM NO. NEW PART NO. OLD PART NO. DESCRIPTION QUANTITY1 715183 843750 Grate - Burner 12

Pagina 4 - INSTALLATION

THISPAGEINTENTIONALLYLEFTBLANK

Pagina 5 - LEVELING THE RANGE

– 2 –STOCK POT INSTALLATION, OPERATION, SERVICE & PARTSIMPORTANT FOR YOUR SAFETYTHIS MANUAL HAS BEEN PREPARED FOR PERSONNEL QUALIFIED TO INSTALL

Pagina 6 - ADJUSTMENTS

– 3 –STOCK POT INSTALLATION, OPERATION, SERVICE & PARTSINSTALLATION, OPERATION, SERVICE & PARTS MANUALSTOCK POT RANGESMODELS VSP100, VSP200 &

Pagina 7 - OPERATION

– 4 –STOCK POT INSTALLATION, OPERATION, SERVICE & PARTSINSTALLATIONNOTE: When installing this appliance, the bottom areaof the range should remai

Pagina 8 - TROUBLESHOOTING

– 5 –STOCK POT INSTALLATION, OPERATION, SERVICE & PARTSThe gas inlet is located at the rear and lower left sideof the range. To ensure maximum op

Pagina 9 - REPLACEMENT PARTS LIST

– 6 –STOCK POT INSTALLATION, OPERATION, SERVICE & PARTSADJUSTMENTSPilot AdjustmentTurn burner valves on to remove air from the line. Turnburner v

Pagina 10 - VSP100 STOCK POT RANGE

– 7 –STOCK POT INSTALLATION, OPERATION, SERVICE & PARTSCONTROLSThe burner is in two sections, controlled by two heavyduty infinite control valves

Pagina 11

– 8 –STOCK POT INSTALLATION, OPERATION, SERVICE & PARTSLUBRICATIONAll valves and thermostats must be checked andlubricated periodically. Contact

Pagina 12 - INTENTIONALLY

– 9 –STOCK POT INSTALLATION, OPERATION, SERVICE & PARTSREPLACEMENT PARTS ORDERINGThe following information must accompany a replacements parts or

Comentarios a estos manuales

Sin comentarios